The fireplace and chimney will be built in stages as there are number of concrete elements in the design (ie lintels etc) which will require time to set. This part of the brickwork will take a bit of time to be fully completed but so far I've gotta say it looks absolutely amazing! The brickwork floors on the terrace and treads on the adjoining stairs will be done at a later date to ensure that they are not damaged during the remainder of construction.
The new timber windows were delivered and installed which has enabled the builder to make a start on the cladding so our house is now starting to look like, well, a house.
| Windows Fitted |
| Cladding almost done |
An unexpected surprise occurred they other day when I arrived to conduct a late afternoon inspection. As I turned the corner and looked towards the end of hallway, I spotted a glimpse of the Brisbane River for the very first time since construction started:
OK, so the view is nothing spectacular but it is a glimpse of water which is a little reminder of how close we live near the River and surrounding parkland.
We are now only two weeks away before the plasterboard goes in at which point the cabinet maker will visit to complete a final check measure for the kitchen and bathroom cabinetry. All the fixtures and fittings have already been chosen, however I still need to select a marble slab for the kitchen and laundry benchtops which I plan to do after the school holidays.